CoreWeave Denton Data Center (Denton, Texas)
DTexas, US · US · CoreWeave, Inc.
OperationalExplicit AI InfrastructureUnder Review
Environment
Water Stress
mediumB
WRI Aqueduct 4.0, 2023, 2023
Aquifer Stress
Not DisclosedND
Grid Carbon Intensity
401 gCO₂/kWhA
EPA eGrid 2022, ERCOT (ERCT) subregion, 2022
Drought Risk
medium
NOAA Palmer Drought Severity Index, 2023
Facility
CompanyCoreWeave, Inc.
OperatorCoreWeave (contracted tenant, per Epoch AI)
CategoryExplicit AI Infrastructure
StatusOperational
Capacity
262 MWC
Epoch AI's directory (updated 2026-07-15) lists a Denton, TX facility as operational with about 262 MW of IT power, about 260 MW of which is contracted to CoreWeave. Figures are third-party estimates.
Location
33.2148, -97.1331 · US
Campus AreaTown centre of Denton, TX (approximate). Campus address not given in sources.
RegionTexas, US
Research statusUnder Review
Evidence (1 source)
Academic2026-07-15
Project status as of 2026-10-26
Updated Jul. 15, 2026 (search-result listing; estimated 262 MW IT power; not opened directly)
Researcher Notes
Added 2026-10-26 from online research; coordinates are town-level unless noted.