Volcano Engine Yangtze River Delta Computing Power Center (Wuhu)

D

Wuhu, Anhui, China · CN · ByteDance

AnnouncedExplicit AI InfrastructurePartially Verified

Environment

Water Stress
mediumB

WRI Aqueduct 4.0 (2023), province baseline water stress: Medium - High (20-40%), 2023

Aquifer Stress
Not DisclosedND
Grid Carbon Intensity
655 gCO₂/kWhA

China Ministry of Ecology and Environment, 2023 provincial average grid CO2 emission factor (Announcement 2025 No. 47), 2023

Grid RegionEast China Grid (Anhui)
Drought Risk
Not DisclosedND

Facility

CompanyByteDance
OperatorWuhu Jiangdong Mingyi Technology Co., Ltd. (芜湖江东名邑科技有限公司), a wholly owned ByteDance subsidiary
CategoryExplicit AI Infrastructure
StatusAnnounced
Capacity
Not DisclosedND

Not disclosed. Planned for 21,800 server cabinets, with a 220 kV substation.

Location
31.1800, 118.2100 · CN
Campus AreaCoordinates are the centre of Wuhu (OpenStreetMap), not the exact campus location.
RegionWuhu, Anhui, China
Research statusPartially Verified

Evidence (1 source)

JournalismJiemian (界面新闻)

Confirms ByteDance as parent, subsidiary operator, Wuhu Economic and Technological Development Zone location, 80 億 yuan investment, 21,800 cabinets, EIA at pre-approval notice

该项目环境影响评价正在实施批前公示... 项目公司芜湖江东名邑科技有限公司是字节跳动(抖音集团)旗下全资公司... 总投资高达80亿元 (The EIA is at pre-approval public notice. The project company is a wholly owned subsidiary of ByteDance (Douyin Group). Total investment up to 8 billion yuan.)

Researcher Notes

A computing center for ByteDance's Volcano Engine cloud. Planning approval was published in May 2024; no construction progress found.