← Infrastructure/Bridge Data Centres MY06 Hyperscale Campus (Sedenak, Johor), ByteDance anchor tenant

Bridge Data Centres MY06 Hyperscale Campus (Sedenak, Johor), ByteDance anchor tenant

D

Johor, Malaysia · MY · ByteDance

OperationalAI-Capable HyperscalePartially Verified

Environment

Water Stress
lowB

WRI Aqueduct 4.0 (2023), province baseline water stress: Low (<10%), 2023

Aquifer Stress
Not DisclosedND
Grid Carbon Intensity
603 gCO₂/kWhB

Ember Yearly Electricity Data, national power sector CO2 intensity, Malaysia 2025, 2025

Grid RegionPeninsular Malaysia (TNB)
Drought Risk
Not DisclosedND

Facility

CompanyByteDance
OperatorBridge Data Centres
CategoryAI-Capable Hyperscale
StatusOperational
Year Opened2022
Capacity
110 MWB

110 MW across three buildings, as announced by the operator, Bridge Data Centres.

Location
1.7100, 103.5300 · MY
Campus AreaCoordinates are the centre of Sedenak (Kulai district) (OpenStreetMap), not the exact campus location.
RegionJohor, Malaysia
Research statusPartially Verified

Evidence (1 source)

Journalism2022-10-20W Media

Confirms MY06 campus in Sedenak, Johor, operator BDC, ByteDance as anchor tenant, 110 MW project, 2022 handover

BDC's first phase hyperscale data centre (MY06) in Sedenak, Johor... 110MW hyperscale data centre project... ByteDance will be the anchor tenant of BDC's hyperscale data centre

Researcher Notes

Built by Bridge Data Centres with ByteDance as anchor tenant. The first building was due to be handed over in 2022.